當(dāng)前位置:首頁(yè) > 譯文賞析

可編程序邏輯控制器翻譯-中英對(duì)照

發(fā)布時(shí)間:2013-7-29      閱讀次數(shù):1266

可編程序邏輯控制器翻譯-中英對(duì)照
負(fù)責(zé)工廠的正常運(yùn)轉(zhuǎn)。所有設(shè)備的不同程序控制功能通過(guò)它來(lái)執(zhí)行,包括,運(yùn)行時(shí)通過(guò)本地控制面板進(jìn)行控制。在緊急情況桌面和控制安裝指令不會(huì)傳輸?shù)絇LC。
只要采用了充足的保護(hù)措施,輸入和輸出數(shù)據(jù)和指令(RIO)可以安裝在監(jiān)控點(diǎn)附近。CPU修正的RIO必須通過(guò)光纖電纜傳輸,并設(shè)計(jì)有不同的冗余和線路。所有工廠和子系統(tǒng)必須通過(guò)網(wǎng)絡(luò)連接到PLC;不同標(biāo)準(zhǔn)安裝的設(shè)施必須通過(guò)輸入和輸出模塊連接。VSB團(tuán)隊(duì)必須通知供應(yīng)商使用的PLC制造商的姓名。一同確定符合工廠要求的模件功能和未來(lái)施標(biāo)準(zhǔn)。如果事先獲得VSB團(tuán)隊(duì)授權(quán),可以使用不同供應(yīng)商的PLC。
供應(yīng)商和VSB團(tuán)隊(duì)之間,必須對(duì)整個(gè)開發(fā)和標(biāo)識(shí)(標(biāo)記)、安排、指令,存儲(chǔ)圖等的理念進(jìn)行討論。所以VSB團(tuán)隊(duì)必須提出一個(gè)具體標(biāo)準(zhǔn)指南或確認(rèn)開發(fā)商的介紹或共同研討。
編程語(yǔ)言采用梯邏輯和功能結(jié)構(gòu)圖。如果無(wú)法避免, 其他語(yǔ)言只允許在指定功能的自定義操作塊之內(nèi)進(jìn)行。
電,自動(dòng)化和測(cè)量系統(tǒng)¤
規(guī)格和設(shè)施指南

15.5 一般概念:
15.5.1 在基本的項(xiàng)目階段期間,自動(dòng)化系統(tǒng)的所有設(shè)備和元件的建筑以及供電理念必須由VSB事先批準(zhǔn)。
15.5.2 必須考慮PLC的數(shù)字,不僅包括“全周期,而且必須與工廠互動(dòng);如有可能,即使CUP無(wú)法運(yùn)行,其它部件可以繼續(xù)運(yùn)行而不受影響;
15.5.3 試運(yùn)行后,PLC的CPU必須至少留有30%的記憶空間;
15.5.4 同一個(gè)模塊所有輸入和輸出(輸入/輸出)不應(yīng)該集中在相同模塊,如果這個(gè)模塊發(fā)生故障,所有相似的設(shè)備的控制數(shù)據(jù)不會(huì)丟失。
15.5.5冗余數(shù)據(jù)或模擬信號(hào)必須連接到不同的PLC模塊。
15.5.6 應(yīng)該預(yù)設(shè)每個(gè)PLC模塊的獨(dú)立保護(hù)裝置。
15.5.7 如果PLC式模塊沒(méi)有任何保護(hù)反對(duì)大氣浪涌,必須安裝流電絕緣材料。
15.5.8 PLC的所有不同的輸入/輸出模塊必須至少留有15%預(yù)配備件。
15.5.9 所有PLC底板必須至少留有10%自由槽孔擴(kuò)容。
15.5.10 遵照以下標(biāo)準(zhǔn),作為參考:
ISA-C 5.1儀器工作標(biāo)志和標(biāo)識(shí)
ISA-C 5.2處理操作二進(jìn)制邏輯圖
ISA-C 5.3分布控制/共享顯示儀器、邏輯和計(jì)算機(jī)系統(tǒng)圖形符號(hào)
ISA-C 5.4儀器回路圖
ISA-C 5.5處理顯示圖形符號(hào)
ISA-C 20程序測(cè)量和控制儀器、主要元件和控制閥規(guī)格圖
ISA-C RP60控制中心設(shè)施
ISA-C 88成批控制
技術(shù)規(guī)格
電,自動(dòng)化和測(cè)量系統(tǒng)¤
規(guī)格和設(shè)施指南
ANSI ISA-C 95企業(yè)-C控制系統(tǒng)一體化
ANSI ISA-C 99制造業(yè)和控制系統(tǒng)安全
IEC 61131-3可編程序邏輯控制器               
15.5.11 PLC和SCADA裝置的構(gòu)造必須完好,當(dāng)執(zhí)行任務(wù)時(shí)以便容易了解并保持良好的操縱穩(wěn)定性。這些指令必須使用葡萄牙語(yǔ),并且,如果不可行,在事先通過(guò)VSB團(tuán)隊(duì)的批準(zhǔn),使用英語(yǔ)指令。
15.5.12 VSB團(tuán)隊(duì)必須接受所有與開發(fā)項(xiàng)目有關(guān)的原始代碼,并且擁有所有使用軟件的許可證明。許可證明必須允許自由安裝到多個(gè)機(jī)器,方便開發(fā)和維護(hù)。 必須在具體項(xiàng)目開始之前證實(shí)該問(wèn)題。
15.5.13 供應(yīng)商必須以書面方式提交自動(dòng)化系統(tǒng)相關(guān)重要設(shè)備(即再熱爐)故障的后備計(jì)劃。
16儀器工作
儀器工作必須為工廠執(zhí)行所有必要的測(cè)量和控制功能?刂圃O(shè)想理念必須獲得工廠供應(yīng)商和VSB團(tuán)隊(duì)的同意,有益于最大限度的積累雙方的專業(yè)技術(shù)。次級(jí)供應(yīng)商名單包含僅第一等級(jí)制造商應(yīng)用的模型必須事先獲得VSB團(tuán)隊(duì)的批準(zhǔn)。要求項(xiàng)目開發(fā)和儀器工作元件的規(guī)格符合標(biāo)準(zhǔn)VS-E-011-2。
16.1 普通條款:
16.1.1 所有發(fā)射機(jī)必須有測(cè)量的可變物的本地顯示。
16.1.2 主要儀器供應(yīng)必須通過(guò)UPS進(jìn)行。注意安裝設(shè)施的整體電磁兼容性。
16.1.3 必須預(yù)見穩(wěn)定電源發(fā)射機(jī)冗余24 Vdc。不同的電源供應(yīng)不同的電路。
16.1.4 發(fā)射機(jī)和其他智能類型元件必須應(yīng)用在主要功能并且通過(guò)PROFIBUS PA連接互聯(lián)網(wǎng)。
15.4 Programmable Logical Controller (PLC)
It must be responsible for the plant operation proper. All process control function of variables
and commands for the equipment must be executed through  it,  including, while the
operation is running, via the local control panels. Only the commands installed on the
emergency desks and panels will not pass through the PLC.
Data inputs and outputs and commands (RIO) may be installed near the monitoring and
control points, as long as they are sufficiently protected. The correction of these RIO's with
the CPU's must be made via fiber optic with different redundancy and routes.
All the plant's units and subsystems must be connected to the PLC via network and those
different from the installation standard must be connected via input and output modules.
VSB will inform the supplier the name of the PLC manufacturer to be used. The model will
be jointly determined in function of the plant's requirements and the standardization in view
of future facilities. The use of PLC's from different suppliers in one plant will not be allowed,
except if there is previous authorization by VSB.
The entire philosophy for developing and identification (tags), arrangement, comments,
memory map, etc. will be discussed between the developer and the VSB team at an
opportune time. Therefore VSB must present a specific standard guideline or validate the
developer's presentation or, still, develop it together.
The programming language must be Ladder Logic and/or the Function Block Diagram.
Other languages will be allowed only, if unavoidable, within customized operational blocks
for specific functions.
|       Issue Date       | 18/06/2008         |      Revision      |      002     | Revision Date   |         04/09/2008         | Page 20 of 25 |
 
TECHNICAL SPECIFICATION
ELECTRICAL, AUTOMATION AND INSTRUMENTATION SYSTEM -SPECIFICATION AND INSTALLATION GUIDELINE  VS1
15.5       General concepts:
15.5.1 The architecture, as well as the electrical supply philosophy for all equipment and elements
of the automation system, must previously be approved by VSB already during the basic
project stage.
15.5.2 The number of PLC's must be determined by considering not only the "Total Cycle Time" but
also the interdependence of the plant's areas, thus making it possible that, even if some
CPU is out of operation, other parts of the plant, whose operation can continue, will not be
affected.
15.5.3 The CPU's of the PLC's must have at least 30% spare space in the program's memory,
considered after commissioning.
15.5.4 All inputs and outputs (l/O's) of the same functionality should not be concentrated in the
same module so that, if this module fails, the control of all similar equipment will not be lost.
15.5.5 Redundant digital or analog signals must be connected to different PLC modules.
15.5.6 Independent protection devices for each PLC module should be foreseen.
15.5.7 Galvanic insulation  must be installed if the PLC's analog modules do not have any
protection against atmospheric surges.
15.5.8 All different I/O modules of the PLC must have at least 15% of prewired spares.
15.5.9 All PLC backplanes must have at least 10% free slots for future expansions.
15.5.10 The following standards, as reference, are to be complied with:
ISA- 5.1 Instrumentation Symbols and Identification
ISA - 5.2 Binary Logic Diagrams for Process Operations
ISA - 5.3 Graphic Symbols for Distributed Control/Shared Display Instrumentation, Logic
and Computer Systems
ISA - 5.4 Instrument Loop Diagrams
ISA - 5.5 Graphic Symbols for Process Displays
ISA - 20 Specification Forms for Process Measurement and Control Instruments, Primary
Elements, and Control Valves
ISA - RP60 Control Center Facilities
ISA - 88 Batch Control
|       Issue Date       | 18/06/2008         |      Revision      |      002     | Revision Date   |         04/09/2008         | Page 21 of 25 |
 
TECHNICAL SPECIFICATION
ELECTRICAL, AUTOMATION AND INSTRUMENTATION SYSTEM -SPECIFICATION AND INSTALLATION GUIDELINE  VS1
ANSI ISA - 95 Enterprise - Control System Integration ANSI ISA - 99 Manufacturing and Control Systems Security IEC 61131-3 Programmable Logic Controllers
15.5.11 The PLC and the SCADA must provide a well-structured base of comments with the
purpose to facilitate understanding and agility when performing tasks. These comments
must be in the Portuguese language and, should this not be possible, VSB must previously
authorize that in such cases the comments will be in English.
15.5.12 VSB must receive all source codes related to the developed programs, as well as all used
software licenses. The licenses must provide freedom to install a sufficient number of
machines for optimum performance of development and maintenance. This matter must be
clarified prior to the Detailed Project.
15.5.13 The supplier must present in writing a Contingency Plan for the case of failure in the
automation system related to critical equipment (e.g. reheating furnaces).
16 INSTRUMENTATION
The instrumentation must perform all necessary measurement and control functions for the plant's perfect functioning. The control philosophy must always be

agreed between the plant's supplier and the VSB team, benefiting at maximum from the know-how accumulated by the parties. The list of sub-suppliers may

contain only first class manufacturers and the models to be applied must be previously approved by the VSB team. Knowledge of standard VS-E-011-2 is

mandatory for the project's development and the specification of the instrumentation elements.
16.1       General conditions:
16.1.1 All transmitters must have a local indication of the measured variable.
16.1.2 The supply of the main instruments must be made via UPS. Attention must always be paid
to the installation's electromagnetic compatibility as a whole.
16.1.3 Redundant 24 Vdc stabilized sources for supplying the transmitter must be foreseen. Each
source must be supplied by different circuits.
16.1.4 Transmitters and other intelligent type elements must be applied in the main functions and
interconnected via PROFIBUS PA network.