777米奇影院狠狠色,无套熟女AV呻吟在线观看,国产精品兄妹在线观看麻豆 ,国产自国产自愉自愉免费24区

當(dāng)前位置:首頁(yè) > 翻譯資源

CTCS-2級(jí)列控系統(tǒng)資料英語(yǔ)翻譯-中英對(duì)照

發(fā)布時(shí)間:2012-10-19      閱讀次數(shù):1912

CTCS-2級(jí)列控系統(tǒng)資料英語(yǔ)翻譯-中英對(duì)照

1 CTCS-2級(jí)列控系統(tǒng) CTCS Train Control System Level 2
CTCS-2級(jí)列控系統(tǒng)是基于ZPW-2000軌道電路+點(diǎn)式應(yīng)答器傳輸列車(chē)運(yùn)行許可信息并采用目標(biāo)距離模式監(jiān)控列車(chē)安全運(yùn)行的列車(chē)運(yùn)行控制系統(tǒng)。CTCS-2級(jí)列控系統(tǒng)在客運(yùn)專(zhuān)線(xiàn)將主要用于實(shí)現(xiàn)兼容250km/h以下鐵路線(xiàn)列控系統(tǒng)和作為ETCS 2系統(tǒng)的備用系統(tǒng)使用。
CTCS Train Control System Level 2 is a train control system based on ZPW-2000 track circuit, which applies a point balise to transmit train operation licence information and adopts object distance mode to monitor safe running of trains. For passenger dedicated lines, CTCS Train Control System Level 2 will be applied mostly in compatibility of control system of railway trains with speed below 250km/h and will be used as the backup system of ETCS System Level 2.
1.1 技術(shù)原則Technical Principle
1.1.1.1 區(qū)間不設(shè)地面信號(hào)機(jī),以車(chē)載顯示作為行車(chē)憑證。Set up no ground signal device in the space intervals but take train display as its travelling basis.
1.1.1.2 在各閉塞分區(qū)入口、進(jìn)站信號(hào)機(jī)、出站信號(hào)機(jī)等處設(shè)置應(yīng)答器組(兩個(gè)以上)設(shè)備,為列車(chē)提供運(yùn)行前方線(xiàn)路參數(shù)、臨時(shí)限速等信息。Install balise units (more than two) for each block range entrance, home signal device and starting signal device to offer data such as parameter of lines ahead and temporary speed limit for trains.     
1.1.1.3 在各出站信號(hào)機(jī)前設(shè)置應(yīng)答器,為列車(chē)提供絕對(duì)停車(chē)信息(需新增CTCS報(bào)文)及列車(chē)發(fā)車(chē)進(jìn)路信息,當(dāng)軌道電路信息為HU碼和無(wú)碼時(shí),接收到此信息列車(chē)立即實(shí)施制動(dòng)停車(chē)。防止極端狀態(tài)下列車(chē)冒出信號(hào)機(jī)。Install balise ahead each starting signal device to offer absolute stop information (updated CTCS massage shall be required) and departure and arrival information for trains. When track circuit signal is displayed as HU code or no code, the train receives this signal will shall brake to stop immediately to prevent output signal of the train under extreme conditions. 
1.1.1.4 用于列車(chē)定位的兩個(gè)相鄰應(yīng)答器(組)間距離不能超過(guò)1500米。The distance between the two adjacent balises (units) for positioning of trains shall be never over 1,500 meters.
1.1.1.5 區(qū)間線(xiàn)路、車(chē)站正線(xiàn)、車(chē)站股道采用ZPW-2000(UM)系列軌道電路,連續(xù)為列車(chē)提供運(yùn)行前方閉塞分區(qū)空閑、道岔側(cè)向進(jìn)路等信息。同載頻且相鄰軌道電路(線(xiàn)間距5米)長(zhǎng)度超過(guò)650米時(shí),應(yīng)進(jìn)行分割,以避免鄰線(xiàn)干擾。Interval lines, station main line and station track apply ZPW-2000(UM)series track circuit, which continuously offers trains with such information as free block range ahead and diverted direction entry of turnout. Adjacent track circuits with the same carrier frequency (distance between lines of 5 meters) shall be split up to avoid interference   if their lengths exceed 650 meters.    
1.1.1.6 對(duì)于簡(jiǎn)單中間小站,道岔彎股采用跳線(xiàn)與直股并聯(lián)的方式實(shí)現(xiàn)軌道電路功能。對(duì)于復(fù)雜大站,道岔彎股采用插入25Hz相敏軌道電路的方式實(shí)現(xiàn)軌道電路功能。For a simple interval small station, turnout bending rail achieves its track circuit function by means of parallel connection of jumping wire and straight rail. While for a complex large station, turnout bending rail achieves its track circuit function by means of inlaying phase-sensitive track circuit.   
1.1.1.7 為解決相鄰軌道電路絕緣破損時(shí)縱向串碼信號(hào)升級(jí)危及正線(xiàn)行車(chē)安全的問(wèn)題,各側(cè)線(xiàn)股道出站信號(hào)機(jī)外方設(shè)置50米短軌道電路。當(dāng)信號(hào)關(guān)閉,該軌道電路發(fā)H碼,當(dāng)信號(hào)開(kāi)放,該軌道電路與股道發(fā)相同碼。Set up 50m short track circuit outside starting signal devices of each side track to settle the problem that the upgrading of longitudinal cross code signal caused by insulation failure will endanger travelling on main lines. The track circuit will send code H when signal is closed down; the track circuit and track will send same code when signal is open.  
1.1.1.8 車(chē)站、區(qū)間中繼站設(shè)置以2X2取2安全計(jì)算機(jī)為平臺(tái)的列控中心(TCC),依據(jù)聯(lián)鎖進(jìn)路、軌道占用、臨時(shí)限速等信息,控制各軌道電路設(shè)備發(fā)碼、應(yīng)答器臨時(shí)限速、應(yīng)答器列車(chē)進(jìn)路等信息。Set up train control centre (TCC) with 2X2 fetch 2 safe computer as its platform at railway stations and interval relay stations to control each track circuit equipment to send codes, temporary speed limit of balise and train entry information supplied by balises according to data such as interlock entry, track occupation and temporary speed limit.   
1.1.1.9 通過(guò)設(shè)置在進(jìn)站信號(hào)機(jī)、出站口、區(qū)間中繼站等處有源應(yīng)答器為列車(chē)提供區(qū)間線(xiàn)路、車(chē)站正線(xiàn)的臨時(shí)限速信息,臨時(shí)限速以閉塞分區(qū)為基本單元,速度設(shè)45km/h、60km/h、80km/h、120km/h、160km/h、220 km/h共6個(gè)等限速級(jí)。Set up entry signal device and active balises at the station exits and interval relay stations to offer temporary speed limit data of interval lines and main lines for trains. Temporary speed limit takes block range as its basic unit with 6 speed limit classes such as 45km/h, 60km/h, 80km/h, 120km/h, 160km/h and 220 km/h.
1.1.1.10 對(duì)于18號(hào)以上的道岔側(cè)向進(jìn)路,在U2S碼的軌道電路入口處設(shè)置一個(gè)有源應(yīng)答器(組),通過(guò)應(yīng)答器“CTCS-4”報(bào)文向列車(chē)提供道岔側(cè)向允許列車(chē)運(yùn)行的速度。For the diverted direction entry of turnout with number above 18, set up an active balise (unit) at the tack circuit entrance of U2S to offer the allowable speed of diverted direction of turnout for trains by “CTCS-4” massage of balise.
1.1.1.11 軌道電路采用碼序?yàn)椋篖5-L5-L4-L3-L2-L-LU-U-HU,滿(mǎn)足300km/h速度列車(chē)安全運(yùn)行的要求。The code order of track circuit is: L5-L5-L4-L3-L2-L-LU-U-HU, meeting the requirements regarding safe running of trains with speed of 300km/h. 
1.1.1.12 其它條件符合既有線(xiàn)200km/h鐵路CTCS-2列控系統(tǒng)相關(guān)規(guī)定。Other conditions meet related specifications on CTCS Train Control System Level 2 of existing railway with speed of 200km/h.
1.2 ZWP-2000軌道電路Track Circuit
ZPW-2000A型無(wú)絕緣移頻軌道電路,源自于法國(guó)高速鐵路UM71軌道電路,經(jīng)過(guò)引進(jìn)、消化、吸收,再創(chuàng)新的歷程,開(kāi)發(fā)而成。在軌道電路傳輸安全性、傳輸長(zhǎng)度、系統(tǒng)可靠性、可維修性以及結(jié)合國(guó)情提高技術(shù)性能價(jià)格比、降低工程造價(jià)上都有了顯著提高。ZPW-2000A uninsulated frequency-shift track circuit was originated from UM71 track circuit of high-speed railway in France, and devolops till now druing a process of  indroduction, digestion, absorption and reinnovation. By now, it has been greatly improved in track circuit transmission security, transmission length, system reliability, maintenanceability and technique-function-price ratio and project cost reduction based on the national conditions of China.  
根據(jù)客運(yùn)專(zhuān)線(xiàn)大量使用無(wú)碴軌道及橋梁、隧道的特點(diǎn),為確保軌道電路可靠工作在無(wú)碴軌道區(qū)段軌道電路按下列條件進(jìn)行設(shè)計(jì)。As per the features of passenger dedicated lines mostly applying ballastless track, bridge and tunnel, track circuit in ballastless track section shall be designed on conditions as follows to ensure the reliable work of track circuit.
(1) 道碴電阻ballast resistance: 3Ω/km
(2) 分路電阻shunt resistance: 0.25Ω
(3) 軌道電路設(shè)計(jì)長(zhǎng)度design length of track circuit: 1000m
(4) 軌道電纜最遠(yuǎn)傳輸長(zhǎng)度為ultimate transmission distance of track cable: 7500m;particular case: 可10000m。
(5) 機(jī)車(chē)信號(hào)最小電流minimum current of locomotive signal: 0.5A at 1700Hz, 2000Hz, 2300 Hz; 0.45A at 2600 Hz.
當(dāng)軌道電纜長(zhǎng)度超過(guò)7500m時(shí),應(yīng)在區(qū)間適當(dāng)位置增設(shè)區(qū)間軌道電路中繼站。Add interval track circuit relay stations at reasonable places of intervals when the length of track cable exceeds 7500m.
發(fā)送器采用1+1冗余方式,接收器采用雙機(jī)并用方式,實(shí)現(xiàn)軌道電路系統(tǒng)的高可靠性。Transmitter applying 1+1 redundant method and receiver applys two-machine use method to achive high reliablity of track circuit system.
站內(nèi)軌道電路按下列方案進(jìn)行設(shè)置。Track circuit inside stations will be set up as per the following scheme.
a. 對(duì)于復(fù)雜大站 For complex large station
站內(nèi)ZPW-2000A軌道電路的布置將完全按照中國(guó)大秦線(xiàn)站內(nèi)ZPW-2000A軌道電路的布置原則進(jìn)行軌道電路布置和劃分,即:正線(xiàn)、股道采用ZPW-2000A軌道電路,在較長(zhǎng)的道岔彎股插入一段25Hz相敏軌道,以解決彎股較長(zhǎng)惡化軌道電路分路問(wèn)題。The Layout of ZPW-2000A track circuit in the stations will be carried out and divided in full accordance with the layout principle of ZPW-2000A track circuit in the sation of China Daqin Railway Line. Namely, main lines and tracks apply ZPW-2000A track circuits and inlay a 25Hz phase-sensitive track into longer turnout bending rail to settle the problem of long bending trail worsening track circuit shunt.
b. 對(duì)于高速線(xiàn)中間站For interval stations in high-speed lines
由于這類(lèi)車(chē)站的規(guī)模小,軌道電路區(qū)段數(shù)量有限,可以根據(jù)實(shí)際站場(chǎng)情況進(jìn)行軌道電路區(qū)段的劃分。站內(nèi)軌道電路采用ZPW-2000A軌道電路。其并聯(lián)方式如下:
Track circuit section may be divided according to actual station conditions owing to small size of these stations and limit sections of track circuit.
道岔區(qū)段軌道電路長(zhǎng)度要求:Length requirement of track circuit at turnout sections:
機(jī)車(chē)信號(hào)電流要求為current of locomotive signal shall be 500mA(1700Hz, 2000Hz和and 2300Hz)or 或450mA(2600Hz)的條件下,and the length of track circuit is as follows軌道電路長(zhǎng)度如下:
軌道區(qū)段類(lèi)型Types of track sections 分路電阻(Ω)Shunt resistance(Ω) 道床漏泄Track bed leakage
(Ω•km) 軌道電路允許的最大長(zhǎng)度(m)
Maximum allowable length of track circuit
道岔區(qū)段Turnout sections
(two branches included含兩個(gè)分支) 0.15 2 600
電源要求Power requirement
(1) 軌道電路設(shè)備只有發(fā)送器、接收器是有源設(shè)備,其它設(shè)備是無(wú)源設(shè)備。Only transmitters and receivers of track circuit equipment are active components, and other are passive components.
(2) 電源電壓范圍:直流23.5V~24.5V。Voltage scope of power: direct current 23.5V-24.5V.
(3) 發(fā)送器正常工作時(shí)負(fù)載為400Ω,輸出功率為1電平時(shí),耗電為5.55A;當(dāng)負(fù)載短路時(shí)耗電小于10.5A。The load of transmitter under normal operation is 400Ω, and when output power is 1 level, its power consumption will be 5.55A. Its consumption will be less than 10.5A when short-circuit of load occurs.
(4) 接收器正常工作時(shí)耗電小于500mA。The electrical consumption of receivers under nomal operation will be less than 500mA.
環(huán)境條件Environmental condition
(1) 室外溫度為Outdoor temperature will be from -30°C to +70°C,室內(nèi)溫度and indoor temperature will befrom為-5°C to +40°C.
(2) 相對(duì)濕度不大于95%(溫度30°C時(shí))Relative moisture will not more than 95% (under temperature of 30°C).
(3) 大氣壓力為Atmospheric pressure will be from 74.8kPa to 106 kPa(at sea level elevation below 2500m海拔高度2500m以下)
電磁兼容性Electromagnetism Compatibility EMC
(1)滿(mǎn)足鐵道部TB/T 3034-2002標(biāo)準(zhǔn)中有關(guān)電磁兼容規(guī)定。Shall meet the specifications regarding electromagnetism compatibility in the TB/T 3034-2002 Standard issued by Ministry of Railways.
(2)系統(tǒng)采用綜合接地系統(tǒng),接地電阻不大于1歐姆。The system apply integrated earthed system with earth resistance not more than 1 Ω.
System RAMS
ZPW-2000A無(wú)絕緣移頻軌道電路發(fā)送器和接收器的平均無(wú)故障間隔時(shí)間(MTBF)大于或等于1.5×105小時(shí)。Average no-failure time interval (MTBF) of transmitters and receivers of ZPW-2000A uninsulated frequency-shift track circuit shall be over or equal to 1.5×105 hours.
根據(jù)目前對(duì)同類(lèi)微電子設(shè)備使用故障率的統(tǒng)計(jì),每段軌道電路According to the cuurent statistic of application failure rate of the microelectronic equipment of the same category, each section of track circuit
發(fā)送故障率為:λ1=1.527×10-4 件/天Transmiting failure rate is: λ1=1.527×10-4 Pcs/day
接收故障率為:λ2=1.498×10-4 件/天Receiving failure rate is: λ2=1.498×10-4 Pcs/day
依以上基礎(chǔ)數(shù)據(jù),按發(fā)送“1+1”、接收雙機(jī)并行工作方式,將一個(gè)電務(wù)段管內(nèi)軌道電路視為一個(gè)系統(tǒng),對(duì)可靠性計(jì)算如下:
As per basic data above, consider the track circuit inside an electrical pipe section as a system by means of “1+1”when transmitting and two-machine parallel operation when receiving. Its reliablility shall be calculated as follows :


No. 系統(tǒng)中含軌道電路區(qū)段數(shù)量Amount of circuit section containing track in system 維修條件Maintenance Conditions 系統(tǒng)無(wú)故障工作時(shí)間Mean time between significant failures (year) 一年內(nèi)系統(tǒng)影響行車(chē)故障件數(shù)(件)
Failure amount of travelling crane due to system within a year (piece)
  有無(wú)值守人員Whether there is personnel  on duty  故障恢復(fù)時(shí)間Time of failure recovery
T(h)  
1 1 No 8 898.127 0.00111
2 200 No 8 4.4906 0.22686
3 200 Yes 1 35.9251 0.02784
4 200 Yes 0.5 71.8502 0.01392
5 200 Yes 50%  0.5 8.3063 0.12039
  No 50% 8  
[注]: 其中:N為系統(tǒng)中軌道電路總數(shù),K為系數(shù),取值0.12。

[Note]: Thereinto:N stands for the total amount of track circuit in system, K is a coefficient, value of 0.12.
設(shè)備尺寸Equipment Dimension
ZPW-2000A設(shè)備機(jī)柜尺寸:900mm(寬)600mm(厚)2400mm(高)。
Dimension of equipment  machine-cabinet ZPW-2000A :  900mm(wide)600mm(thick)2400mm(high)
1.2.1 地面列控中心  Station Train Control Center
列控中心(TCC)根據(jù)其管轄范圍內(nèi)軌道占用、車(chē)站進(jìn)路及邊界條件等信息,按照CTCS技術(shù)規(guī)范規(guī)定的軌道電路碼序、應(yīng)答器信息,控制軌道電路的發(fā)碼信息和應(yīng)答器信息,向列車(chē)提供其行車(chē)所需要的運(yùn)行許可。地面列控中心(TCC)采用基于K5B-MC型2×2取2安全計(jì)算機(jī)平臺(tái),具有技術(shù)成熟、可靠等特點(diǎn)。
Train Control Center (TCC) provides trains with operating license required by travelling crane based on occupied tracks in  its domination, station route and boundary condition, etc. and in accordance with code order of track circuit, responder information, code sending information and responder information specified by CTCS technical specification. Station Train Control Center (TCC) has mature and dependable technology by applying safe computer platform based on K5B-MC type 2×2 taking 2.
地面列控中心(TCC)是在K5B計(jì)算機(jī)聯(lián)鎖2x2取2平臺(tái)上開(kāi)發(fā)的列控中心產(chǎn)品,滿(mǎn)足鐵道部CTCS2級(jí)技術(shù)規(guī)范要求,產(chǎn)品平臺(tái)經(jīng)歷了聯(lián)鎖超過(guò)200個(gè)車(chē)站的運(yùn)用考驗(yàn),性能穩(wěn)定可靠。
Station Train Control Center (TCC) is a TCC exploited product interlocked on K5B computer 2x2 taking 2 platform to satisfy technical standard and requirement of grade 2 of CTCS; product platform has experienced by over 200 interlocked stations tests, with steady and dependable performance.
地面列控中心(TCC)實(shí)現(xiàn)了軌道電路編碼、應(yīng)答器報(bào)文存儲(chǔ)、LEU報(bào)文控制、區(qū)間信號(hào)機(jī)控制等功能。
Station Train Control Center (TCC) realizes code of track circuit, massage storage of responder,  LEU massage control, machine control to section signal, and other functions.
ZPW-2000A軌道電路信息編碼,區(qū)間信號(hào)機(jī)控制,LEU報(bào)文控制等功能通過(guò)建立在K5B 二乘二取二平臺(tái)上的列控中心(簡(jiǎn)稱(chēng)TCC)進(jìn)行控制。列控中心(TCC)根據(jù)其管轄范圍內(nèi)軌道占用、車(chē)站進(jìn)路及邊界條件等信息,按照CTCS技術(shù)規(guī)范規(guī)定的軌道電路碼序,控制軌道電路的發(fā)碼信息,向列車(chē)提供其行車(chē)所需要的運(yùn)行許可;根據(jù)調(diào)度中心/車(chē)站值班員設(shè)置的臨時(shí)限速信息,控制LEU報(bào)文。
The function of ZPW-2000A about information code of track circuit, machine control to section signal, LEU massage control, etc. was controlled by Train Control Center (hereafter called TCC), establishing on K5B 2x2 taking 2 platform. Train Control Center (TCC) provides trains with operating license required by travelling crane based on occupied tracks in its domination, station route and boundary condition, etc. and in accordance with code order of track circuit, responder information, code sending information and  responder information specified by CTCS technical specification; to control LEU message based on temporary speed restricting information set up by dispatching centre/ person of station on duty.
列控中心(TCC)的主機(jī),采用日本京三制作所研制的采用32位處理器的高性能計(jì)算機(jī)系統(tǒng),其具有2×2取2的冗余結(jié)構(gòu),并以主從方式并行運(yùn)行。每系采用“故障-安全”的雙CPU處理器F486。兩系具有相同的硬件結(jié)構(gòu),之間通過(guò)并行接口建立的高速通道交換信息,實(shí)現(xiàn)2重系的同步和切換。該系統(tǒng)的安全性通過(guò)日本鐵道綜合技術(shù)研究所審查和日本運(yùn)輸省認(rèn)證,達(dá)到鐵路信號(hào)控制系統(tǒng)的安全性要求,符合“故障-安全”原則,具有高的可靠性和安全性。
Main frame of Train Control Centre (TCC) applies computer of high performance system with 32 bits processor researched by Japanese KYOSAN, which has 2x2 taking 2, redundant structure and operates in both principal and subordinate manners. Each system adopts “failure-safety” professor F486 with double CPUs. Both systems have the same hardware structures, establishing high speed passage to exchange information by parallel interface, realizing in-phrase and switch of double systems. The safety of this system has approved by Japan Comprehensive Technology Institution of Railway and authenticated by Japanese Ministry of Transportation, achieved safety requirement of railway signal control system, and confirmed to principle of “failure-safety”, with high dependability and safety.
“故障-安全”處理器的兩個(gè)CPU在同一個(gè)時(shí)鐘源控制下,實(shí)現(xiàn)總線(xiàn)級(jí)同步,總線(xiàn)比較器以時(shí)鐘為單位,對(duì)雙CPU的處理經(jīng)過(guò)、處理結(jié)果進(jìn)行對(duì)照檢查,經(jīng)總線(xiàn)比較器比較,雙CPU運(yùn)行完全一致時(shí),正常繼電器吸起,輸出“光/電轉(zhuǎn)換電路”接通電源,輸出有效。當(dāng)發(fā)生故障時(shí),總線(xiàn)比較器可以作到對(duì)CPU及周邊器件故障,在最短的時(shí)間內(nèi)(即一個(gè)CPU時(shí)鐘周期內(nèi))最及時(shí)的發(fā)現(xiàn),通過(guò)屏蔽對(duì)外輸出或停止CPU動(dòng)作,使安全得到最有效的保證。
Under control of the same clock source, two CPUs of “failure-safety” processor realize synchronous bus grade, bus comparator takes clock as unit to compare and check disposal procedure and result of the double CPUs, after comparing by bus comparator, and double CPUs operating consistently, normal electrical relay sucks up and outputs “light/electricity transforming circuit” turn-on power supply, with effective output. When failure takes place, bus comparator will immediately detect failures of CPU and peripheral in the shortest time (namely, within one CPU clock period), through shielding external output or stopping CPU action to assure the most effective safe guarantee.
每系主機(jī)由IPU6(電源板)、F486-4(CPU板)、FSIO(通信擴(kuò)展板)、ZSIO2-Ci(RS422擴(kuò)展板)、CANIF(CAN擴(kuò)展板)、VHSC6(LAN擴(kuò)展板)組成。ZSIO2-Ci、CANIF、VHSC6通信接口擴(kuò)展板可以根據(jù)系統(tǒng)的通信需要進(jìn)行擴(kuò)展。機(jī)籠內(nèi)的各電路板之間通過(guò)母板上的VME總線(xiàn)互連。列控主機(jī)機(jī)籠配置見(jiàn)圖4。
Each system of main frame is composed of IPU6(power supply panel), F486-4(CPU panel), FSIO(extensive communication panel), ZSIO2-Ci(RS422 extensive panel), CANIF(CAN extensive panel), VHSC6(LAN extensive panel). Extensive panel of communication interface about ZSIO2-Ci、CANIF, and VHSC6  may be extended according to requirement of communication. Each circuit panel in machine cage is connected by bus VME on motherboard.  see layout of train control main frame in fig.4.

 
System 1 Power panel, CPU panel, extensive communication panel, extensive communication panel, RS422 extensive panel, CAN extensive panel, LAN extensive panel, LAN extensive panel
System 2 Power panel, CPU panel, extensive communication panel, extensive communication panel, RS422 extensive panel, CAN extensive panel, LAN extensive panel, LAN extensive panel
列控主機(jī)每一系有5個(gè)連接電子終端的通信接口,每個(gè)通信接口可連接一個(gè)電子終端機(jī)籠。
Each system of train control main frame has 5 communicating interfaces for electron terminals, with each communicating interface connecting to one electron terminal cage.
列控主機(jī)每系有相同的“故障-安全”雙CPU結(jié)構(gòu),CPU板結(jié)構(gòu)原理見(jiàn)圖5。雙CPU的同步、比較和輸出管理通過(guò)硬件實(shí)現(xiàn)。
Each system of train control main frame has the same “failure-safety” double CPUs structure,   see CPU panel structure and principle in fig. 5. Management system of comparison and output will be carried out by double CPUs.

 

The first line: Memorizer, Signal inputting in-phase of other system, Signal inputting in-phase of this system                          
The second line: Clock, Comparator of bus, Safe drive FDS for failure, Normal electrical relay,                                       
                                      Memorizer
Bus (總線(xiàn))
The third line: Memorizer
“故障-安全”處理器的兩個(gè)CPU在同一個(gè)時(shí)鐘源控制下,實(shí)現(xiàn)總線(xiàn)級(jí)時(shí)鐘同步,總線(xiàn)比較器以時(shí)鐘為單位,對(duì)雙CPU的處理經(jīng)過(guò)、處理結(jié)果進(jìn)行對(duì)照檢查,經(jīng)總線(xiàn)比較器比較,雙CPU運(yùn)行完全一致時(shí),正常繼電器吸起,輸出“光/電轉(zhuǎn)換電路”接通電源,輸出有效。當(dāng)發(fā)生故障時(shí),總線(xiàn)比較器可以作到對(duì)CPU及周邊器件故障,在最短的時(shí)間內(nèi)(即一個(gè)CPU時(shí)鐘周期內(nèi))最及時(shí)的發(fā)現(xiàn),通過(guò)屏蔽對(duì)外輸出或停止CPU動(dòng)作,使安全得到最有效的保證。

Under control of the same clock source, two CPUs of “failure-safety” processor realize in-phase bus grade clock, bus comparator takes clock as unit to compare and check the double CPUs disposal procedure and result, after comparing by bus comparator, and double CPUs operating consistently, normal electrical relay sucks up and outputs “light/electricity transforming circuit” turn-on power supply, with effective output. When failure takes place, bus comparator will immediately detect failures of CPU and peripheral in the shortest time (namely, within one CPU clock period), through shielding external output or stopping CPU action to assure the most effective safe guarantee.

CPU1的處理結(jié)果可以最終輸出,CPU2沒(méi)有輸出途徑,只用于安全性校核。
Disposal result of CPU1 will finally output, CPU2 does not have available output approach, which is only applied in checking safety.
CPU1和CPU2上運(yùn)行的軟件代碼在CPU指令級(jí)完全一致,CPU1和CPU2的硬件結(jié)構(gòu)和外圍電路完全一致,從而保證雙CPU的時(shí)鐘級(jí)同步。
The software codes operated on CPU1 and CPU2 are entirely identical to CPU dictation grade. Hardware structures of CPU1 and CPU2 are identical to surrounding circuit to ensure the clock of double CPUs synchronically. 
列控主機(jī)由并列兩重系組成,以主從方式并行運(yùn)行。兩系間通過(guò)并行接口(FIFO)建立的高速數(shù)據(jù)通道交換信息,實(shí)現(xiàn)2系的同步和切換。
Main frame of train control is composed of double systems, operating in principal and subordinate manners. The two systems establish high speed data passage to exchange information by two parallel interface (FIFO) and to realize in-phase and switch of system 2.
列控主機(jī)的二重系安裝在一個(gè)機(jī)架的一個(gè)母板上,雙機(jī)信息交換通過(guò)母板互連,不需要要經(jīng)過(guò)外部的電纜連接。雙機(jī)切換由CPU板內(nèi)的安全電路實(shí)現(xiàn),不另設(shè)獨(dú)立的切換電路。二重系之間沒(méi)有經(jīng)過(guò)外部連接的通道,從而保證了雙機(jī)切換控制的高安全性和高可靠性。二重系的切換原理基于:
Double systems of train control main frame are installed on a motherboard in a machine holder; the information exchange of two machines was connected by motherboard, without passing through exterior cable connection. The switch of both machines was realized by safe circuit installed in CPU panel, no independent switch circuit is needed. There is no connecting passage through exterior connection between double systems in order to ensure high safety and dependability of double machine switch. The switch principle of double system based on:

列控主機(jī)主、從系各自執(zhí)行全部處理功能。
Principal system and subordinate system of train control main frame shall enforce entirely disposal functions.
列控主機(jī)主系在每個(gè)處理周期的啟始時(shí)刻向從系發(fā)出同步信號(hào),令從系與主系保持周期同步。
Principal system of train control main frame will give off an in-phase signal to system at the beginning of each disposal period, to keep the periods of principal system and subordinate system synchronous.
列控主機(jī)主、從系交換處理結(jié)果。從系取與主系一致的結(jié)果輸出。
 Exchanging and disposal results shall be performed by principal system and subordinate system of train control main frame. Subordinate system takes the result in accordance with principal system.
當(dāng)主系因故障停止輸出時(shí),從系自動(dòng)接替工作,變?yōu)橹飨担WC整個(gè)系統(tǒng)的不間斷運(yùn)行
When main system stops outputting due to failure, subordinate system will relay on operation automatically and become principal system to ensure whole system shall run without interruption.
CANIF(CAN擴(kuò)展板)配置于列控中心主機(jī)機(jī)籠內(nèi),通過(guò)VME總線(xiàn)與主機(jī)通信。每塊CANIF板可以提供獨(dú)立的兩個(gè)CAN通信接口,支持CAN2.0B通信協(xié)議。通過(guò)CAN總線(xiàn)接口,可以實(shí)現(xiàn)與軌道電路的通信連接。還可以通過(guò)CAN轉(zhuǎn)RS422/RS485模塊擴(kuò)展RS422/RS485接口。
CANIF(CAN extensive panel)is installed in main frame of TCC, communicated with main frame by VME bus. Each CANIF panel may offer two independent CAN communicating interfaces, sustaining CAN2.0B communication protocol. It is possible to realize communicating connection with track circuit by CAN bus. Meanwhile, RS422/RS485 interface may be extended by transferring CAN to RS422/RS485 module.

125M回線(xiàn)由L回線(xiàn)、R回線(xiàn)雙重構(gòu)成,與LAN 相連接的裝置也為雙重構(gòu)成,雙系裝置的各系分別與L回線(xiàn)、R回線(xiàn)雙方接續(xù),同時(shí)通信。雙系裝置的各系為“故障-安全”裝置。
The loop wire of 125M local area network is comprised of double constitutions, namely L loop and R loop. The device connected with LAN is also has double constitutions. The double-system device is a two way connection and performs a simultaneous communication by L loop and R loop respectively. Double-system device is a “failure-security” device for each system.
通過(guò)該局域網(wǎng)可以實(shí)現(xiàn)列控中心與車(chē)站聯(lián)鎖的通信連接,同時(shí)實(shí)現(xiàn)相鄰列控中心之間和主分列控中心之間的通信。
Communication connection between train control centre and station interlock shall be realized through this local area network. At the same time communication between adjacent train control centre and main distribution train control centre is also available.  
由于ZPW-2000A軌道電路傳輸距離的限制(不大于7.5Km),在站間距離超過(guò)15Km的線(xiàn)路中間設(shè)立1個(gè)或多個(gè)中繼站。
Limited by the transportation space of ZPW-2000A track circuit (7.5Km maximum), one or more relay stations shall be set up in which the station space is exceed 15Km.
列控中心(TCC)需要與軌道電路接收、發(fā)送設(shè)備、車(chē)站聯(lián)鎖、微機(jī)監(jiān)測(cè)等進(jìn)行接口,交換數(shù)據(jù)。列控中心(TCC)之間也需要交換數(shù)據(jù)。
Train control centre shall interface and exchange data with receiving and transmission equipment of track circuit, station interlock and computer monitoring, etc. Data exchange is also required between train control centres. 
通過(guò)CAN總線(xiàn)與軌道電路接收器、發(fā)送器接口;
To interface with track circuit receiver and transmitter by CAN bus.
通過(guò)RS422與LEU進(jìn)行通信,通信接口滿(mǎn)足歐標(biāo)‘S’接口的規(guī)范要求;
Communicate with LEU through RS422; communication interface shall meet the requirements of “S” interface in Europe standard.
列控中心之間通過(guò)125M光纖網(wǎng)連接,傳遞邊界條件及方向等信息;
Information of boundary condition and direction delivery between train control centres shall be transmitted by connecting with 125M optical network.
與DS6-K5B車(chē)站聯(lián)鎖間采用125M光纖網(wǎng)連接, 進(jìn)行安全信息傳輸;
Apply 125M optical network 125M to connect with DS6-K5B station interlock optical network to ensure safe information transmission.
與其它列控系統(tǒng)如需交換信息,可采用串行通信方式通過(guò)光纖傳輸進(jìn)行安全信息交換,也可采用繼電器接口通過(guò)電纜方式連接。
When exchange information with the other train control system, serial communication mode may be applied to perform information exchange through optical transformation, and adopt the relay interface with cable mode connection is also applicable.
K5B-TCC與DS6-K5B聯(lián)鎖采用統(tǒng)一平臺(tái),和統(tǒng)一機(jī)柜電源設(shè)計(jì)。有關(guān)該平臺(tái)的EMC、RAMS分析,環(huán)境條件,以及機(jī)柜尺寸和電源要求請(qǐng)參見(jiàn)DS6-K5B聯(lián)鎖技術(shù)規(guī)格書(shū)相關(guān)章節(jié)。
The interlock between K5B-TCCand DS6-K5B applied the uniform platform and uniform cabinet power design. EMC and RAMS analysis, environment condition, cabinet dimension and power requirement regarding this platform, pleased refer to the relative chapter in DS6-K5B interlock specification.
1.2.2 應(yīng)答器Balise,
應(yīng)答器將全部采用本地化生產(chǎn)的滿(mǎn)足鐵道部應(yīng)答器技術(shù)條件的應(yīng)答器設(shè)備,有源應(yīng)答器的地面編碼單元(LEU)將方在信號(hào)機(jī)械室內(nèi)并直接由地面列控中心(TCC)通過(guò)RS422串行通信接口進(jìn)行控制。一個(gè)地面編碼單元(LEU)可控制4個(gè)有源應(yīng)答器,其間傳輸電纜長(zhǎng)度最長(zhǎng)2500米。
All balises shall apply the local balise products which meet the balise technical specification of Ministry of Railways. Land encoding unit (LEU) of active balise shall be located in signal mechanical room and directly controlled by train control centre by RS422 serial communication interface. One land encoding unit may control 4 active balises with the maximum length of transformation cable of 2500 meters.
根據(jù)CTCS-2級(jí)列控系統(tǒng)工作要求,在每個(gè)閉塞分區(qū)入口處、進(jìn)站信號(hào)機(jī)、出站信號(hào)機(jī)處設(shè)置應(yīng)答器組,為車(chē)載設(shè)備提供定位、線(xiàn)路參數(shù)、臨時(shí)限速等信息,其中定位信息也同時(shí)提供給ETCS-2級(jí)系統(tǒng)使用。
In accordance with the working requirements of CTCS-2 level train control system, at the entrance of each block range, in-station signal, out-station signal, balise shall be equipped to provide information of orientation, line parameters and temporary speed limit etc. In all these information orientation information is also supplied to the ETCS-2level system in the same time.  
進(jìn)站信號(hào)機(jī)、出站信號(hào)機(jī)處設(shè)置一個(gè)有源應(yīng)答器和一個(gè)無(wú)源應(yīng)答器,用以提供列車(chē)接發(fā)車(chē)進(jìn)路線(xiàn)路參數(shù)及臨時(shí)限速、列車(chē)運(yùn)行方向等信息。
An active balise and a passive balise shall be equipped on in-station signal and out-station signal respectively to provide information including train entering and departure line parameters, temporary speed limit and train running direction, etc.
各區(qū)間閉塞閉塞分區(qū)入口處設(shè)置兩個(gè)無(wú)源應(yīng)答器,用以提供列車(chē)運(yùn)行前方線(xiàn)路參數(shù),并提供列車(chē)運(yùn)行方向信息。
Block of each interval and block range entrance shall be equipped with two passive balises to provide information including train running line parameters as well as information of train running direction.
為提高臨時(shí)限速實(shí)時(shí)性,區(qū)間中繼站處設(shè)置一個(gè)有源應(yīng)答器,用以提供列車(chē)運(yùn)行前方臨時(shí)限速信息。
For improving the real time practicability of temporary speed limit, relay station of sections shall be equipped with an active balise to provide temporary speed limit information for train running direction. 
2 兼容CTCS 2  Compatibility CTCS 2
為滿(mǎn)足CTCS-2系統(tǒng)的動(dòng)車(chē)組由既有線(xiàn)運(yùn)行至高速線(xiàn)的需求,高速線(xiàn)列控系統(tǒng)應(yīng)與CTCS-2系統(tǒng)兼容。
As to meet the requirements of dynamic group of CTCS-2 system from current railway to high speed line, the system of high speed line shall be compatible with CTCS2.
在高速線(xiàn)ETCS系統(tǒng)與CTCS-2系統(tǒng)的主要差異表現(xiàn)為地面系統(tǒng)為車(chē)載設(shè)備提供運(yùn)行許可(目標(biāo)距離、目標(biāo)速度)信息的途徑不同,ETCS系統(tǒng)是通過(guò)在每一個(gè)閉塞分區(qū)入口處(包括進(jìn)、出站信號(hào)機(jī))設(shè)置的有源應(yīng)答器向列車(chē)傳送ETCS /CTCS-L2報(bào)文的形式實(shí)現(xiàn),而CTCS-2系統(tǒng)是通過(guò)軌道電路連續(xù)向列車(chē)傳送列車(chē)運(yùn)行前方空閑閉塞分區(qū)數(shù)量,根據(jù)軌道信息和應(yīng)答器數(shù)據(jù)CTCS L2車(chē)載設(shè)備能夠計(jì)算制動(dòng)曲線(xiàn)相關(guān)的移動(dòng)授權(quán)數(shù)據(jù),兩系統(tǒng)其余工作是基本相同的。額外的ETCS 功能對(duì)CTCS 2級(jí)系統(tǒng)來(lái)說(shuō)是透明的,由于CTCS 系統(tǒng)忽略應(yīng)答其中的ETCS專(zhuān)用數(shù)據(jù)。
The main difference between ETCS system and CTCS-2 system is the different approach to provide operating permission information (object distance, object speed) for ground system as well as equipment on the train. The implementation of ETCS system is to provide ETCS /CTCS-L2 message through the active balise which equipped on each block section entrance (including in-station signal, out-station signal). However, the implementation of CTCS-2 system is to provide the number of idle block sections in the direction of train running consistently to train through track circuit. According to track information and balise data, the CTCS L2 equipment on the train may calculate the moving authorization data related with braking curve. The rest of work of the two systems is the same. As to CTCS 2 level system the additional ETCS function is transparent due to the CTCS override to response the data specialized for ETCS system.          
為滿(mǎn)足3分鐘運(yùn)行間隔要求和與ETCS系統(tǒng)兼容,CTCS-2系統(tǒng)閉塞分區(qū)軌道電路設(shè)置與ETCS系統(tǒng)相同,采用ZPW-2000A軌道電路,軌道電路編碼通過(guò)列控中心(TCC)進(jìn)行直接控制,信息符合CTCS系統(tǒng)技術(shù)規(guī)范的要求。
To meet the requirements of 3 minutes interval for operating and compatible with ETCS system, CTCS-2 system is the same with ETCS system in the respect of the track circuit in block sections, which applied ZPW-2000A track circuit and the code of track circuit is directly controlled by train control centre(TCC), information shall confirm to the requirements of CTCS system.  
CTCS-2系統(tǒng)應(yīng)答器設(shè)置與ETCS系統(tǒng)相同,通過(guò)在ETCS系統(tǒng)應(yīng)答器中增設(shè)CTCS報(bào)文以滿(mǎn)足CTCS-2系統(tǒng)的需要。在應(yīng)答器報(bào)文中應(yīng)答器鏈接、靜態(tài)速度曲線(xiàn)(SSP)、線(xiàn)路坡度、特殊區(qū)段、級(jí)間轉(zhuǎn)換、絕對(duì)停車(chē)和調(diào)車(chē)危險(xiǎn)信息包是兩系統(tǒng)共用信息。
The function of balise in CTCS-2 is the same with ETCS system. Requirements of CTCS-2 system are satisfied through adding the CTCS message in balise of ETCS system. The share information of two systems include balise link in balise message, SSP, railway slope, special section, level exchange, absolute shot down and shunting risk information.
3 備用系統(tǒng) Backup system
客運(yùn)專(zhuān)線(xiàn)列控系統(tǒng)采用ETCS-2級(jí)并兼容CTCS-2級(jí)的列控系統(tǒng),當(dāng)ETCS-2級(jí)系統(tǒng)車(chē)載設(shè)備、GSM-2通信系統(tǒng)、地面無(wú)線(xiàn)閉塞中心等設(shè)備故障時(shí)列車(chē)制動(dòng)停車(chē),經(jīng)調(diào)度同意車(chē)載設(shè)備人工轉(zhuǎn)換到CTCS-2系統(tǒng),列車(chē)按CTCS-2系統(tǒng)繼續(xù)運(yùn)行。
故障導(dǎo)致CTCS-2系統(tǒng)也無(wú)法正常工作時(shí),列車(chē)制動(dòng)停車(chē),按調(diào)度命令行車(chē)。
The train control system of passenger dedicated lines applies ETCS-2 system and compatible with the train control system of CTCS-2 level. When train is braking and stop due to the failure of equipments on train, GSM-2 communication system and ground wireless block centre, etc. Agreed by dispatching department, the equipment on train shall be switch to CTCS-2 system manually, and train operate under the system of CTCS-2.
When failure result the malfunction of CTCS-2 system, train shall be shut down and accept the arrangement of dispatching department.     


1.1 附件:軌道電路信息定義及低頻分配
    Appendix: Definition of track circuit and low frequency distribution
2 軌道電路信息定義 Definition of track circuit 
2.1.1.1 L6碼(預(yù)留):表示運(yùn)行前方8個(gè)及以上閉塞分區(qū)空閑。
         L6 code (reserved): to indicate there are 8 or more than 8 block sections ahead. 
2.1.1.2 L5碼:表示運(yùn)行前方7個(gè)及以上閉塞分區(qū)空閑。
         L5 code: to indicate there are 7 or more than 7 block sections ahead. 
2.1.1.3 L4碼:表示運(yùn)行前方6個(gè)及以上閉塞分區(qū)空閑。
L4 code: to indicate there are 6 or more than 6 block sections ahead. 
2.1.1.4 L3碼:表示運(yùn)行前方5個(gè)及以上閉塞分區(qū)空閑。
         L3 code: to indicate there are 5 or more than 5 block sections ahead. 
2.1.1.5 L2碼:表示運(yùn)行前方4個(gè)及以上閉塞分區(qū)空閑。
          L2 code: to indicate there are 4 or more than 4 block sections ahead. 
2.1.1.6 L碼:表示運(yùn)行前方3個(gè)及以上閉塞分區(qū)空閑。
         L code: to indicate there are 3 or more than 3 block sections ahead. 
2.1.1.7 LU碼:表示運(yùn)行前方2個(gè)閉塞分區(qū)空閑。
        LU code: to indicate there are 2 or more than 2 block sections ahead. 
2.1.1.8 LU2碼:表示列車(chē)運(yùn)行前方2個(gè)閉塞分區(qū)空閑。
         LU2 code: to indicate there are 2 block sections ahead. 
2.1.1.9 U碼:表示列車(chē)運(yùn)行前方1個(gè)閉塞分區(qū)空閑。
         U code: to indicate there are 1 block sections ahead. 
2.1.1.10 U2S碼:要求列車(chē)限速運(yùn)行,預(yù)告列車(chē)運(yùn)行前方閉塞分區(qū)為UUS碼。
         U2S code: require train running at a limit speed and warning the block section ahead is UUS code.
2.1.1.11 U2碼:要求列車(chē)限速運(yùn)行,預(yù)告列車(chē)運(yùn)行前方閉塞分區(qū)為UU碼。
         U2 code: require train running at a limit speed and warning the block section ahead is UU code.
2.1.1.12 UUS碼:要求列車(chē)限速運(yùn)行(默認(rèn)道岔允許速度:80km/h),表示列車(chē)接近的地面信號(hào)機(jī)開(kāi)放經(jīng)18號(hào)道岔側(cè)向位置進(jìn)路。
         UUS code: require train running at a limit speed (the implied railroad switch speed: 80km/h),to indicate that train is close to ground and number 18 railroad is open to pass.
2.1.1.13 UU碼:要求列車(chē)限速運(yùn)行(默認(rèn)道岔允許速度45km/h),表示列車(chē)接近的地面信號(hào)機(jī)開(kāi)放經(jīng)道岔側(cè)向位置的進(jìn)路。
         UU code: require train running at a limit speed (the implied railroad switch speed: 45km/h),to indicate that train is close to ground and railroad is open to pass.
2.1.1.14 HB碼:表示列車(chē)接近的進(jìn)站或接車(chē)進(jìn)路信號(hào)機(jī)開(kāi)放引導(dǎo)信號(hào)或通過(guò)信號(hào)機(jī)顯示容許信號(hào)。
         HB code: to indicate that train is close to station or in-station signal is open or signal indicates to pass.
2.1.1.15 HU碼:要求及時(shí)采取停車(chē)措施。
         HU code: require adopting stop measure on time.
2.1.1.16 H碼:要求立即采取緊急停車(chē)措施。
         H code: require adopting stop measure on time.
3 低頻信息分配表 Low Frequency Distribution Chart

譯路通武漢翻譯公司

2012.10.19

  返回>>Top
-x