777米奇影院狠狠色,无套熟女AV呻吟在线观看,国产精品兄妹在线观看麻豆 ,国产自国产自愉自愉免费24区

當(dāng)前位置:首頁(yè) > 翻譯資源

礦床許可位置和詳細(xì)情況-中英對(duì)照

發(fā)布時(shí)間:2012-12-25      閱讀次數(shù):1495

礦床許可位置和詳細(xì)情況-中英對(duì)照
2.1許可位置
Kuludjun 許可位置在俄羅斯邊界(圖1)南部,位于哈薩克斯坦的東北。 許可位置位于于經(jīng)度49° 09' 15";緯度83° 05' 45"處。 經(jīng)過(guò)兩小時(shí)車程,在批準(zhǔn)的道路上進(jìn)入從Ust-Kamenogorsk到Samarskoe,大約距東南方110 公里處。 Ust-Kamenogorsk是東哈薩克斯坦的首都,并每日有來(lái)自Almaty的商業(yè)的航班。 Kuludjun 地區(qū)的營(yíng)地大約距Samarskoe西北20 公里, Kaskad N.已經(jīng)建造好一段簡(jiǎn)易公路進(jìn)入該地區(qū)。
 
除了通過(guò)許可證領(lǐng)域的高電壓電源線,在Kuludjun周圍有基礎(chǔ)設(shè)施。不過(guò),由于大量金礦,銅鉛和鋅礦,銅鉛鋅和金礦以及稀有礦存在的緣故,Ust Kamenogorsk附近的基礎(chǔ)設(shè)施較好。 Kuludjun 礦區(qū)的位置在受益于以前的良好的發(fā)展歷史。

2.2 許可細(xì)節(jié)
Kuludjun的矩形許可地區(qū)(圖5)包括49° 14' 13" 和 83° 01' 30", 49° 14' 13" 和 83° 10' 00", 49° 04' 00" 和 83° 10' 00", 和 49° 04' 00" 和 83° 01' 30". (附錄2)。 許可地區(qū)包括一個(gè)220 km2的領(lǐng)域范圍,并且擁有的6 年探索許可,原先為14 年采礦許可證,2006年8月23號(hào)通過(guò)能源部和礦產(chǎn)資源部門的批準(zhǔn)。

SRKES不承擔(dān)任何法律以及適當(dāng)?shù)脑u(píng)鑒,確定許可證是否遵守規(guī)章或者符合要求的規(guī)章報(bào)告。Kaskad N:提供下列信息
Kuludjun技術(shù)評(píng)估: SRKES 7119                                                        第三頁(yè)
Kaskad N                                                                            SRK 探索服務(wù)                                                             
在勘探期間,勘探許可證的更新必須按照Kaskad N 完成工期的范圍。在這方面Kaskad N已經(jīng)承諾6 年580萬(wàn)美元的投入,包括在第一年的300,000美元, 第兩年為500,000美元,第3 和4 年每年100萬(wàn)美元,以及在第5 和6 年中的每年150萬(wàn)美元。 年勘探支出的重要的百分比將應(yīng)用在掘溝,鉆取和地下作業(yè)的開支。年份  掘溝
(rn3)  勘鉆
(m) UGDev
(m) 花費(fèi)
(百萬(wàn)美元)
1  5000  2000   0.3
2  5000  3000   0.5
3  5000  8000  1000  1.0
4  5000  7500  800  1.0
5   7500  1000  1.5
6   3000  700  1.5

 20,000  31,000  3500  5.8


表格1:探索許可證的6 年時(shí)間內(nèi), Kaskad N工作范圍每度支出的摘要。 分析開銷,人事和輔助費(fèi)用的費(fèi)用。 UG 指地下開發(fā)。
Kaskad N 必須在第2 年末提交報(bào)告給國(guó)家自然保護(hù)區(qū)委員會(huì):報(bào)告詳述,初步地質(zhì)發(fā)現(xiàn)和資源評(píng)估。詳細(xì)的資源的和預(yù)期評(píng)估也必須提交在第4 和6年的末提交委員會(huì)通過(guò)。
Kaskad N 必須支付各種各樣的社會(huì)計(jì)劃590萬(wàn)美元。 其中220萬(wàn)美元,每年以110,000美元的比率支付局部地區(qū)內(nèi)的社會(huì)和經(jīng)濟(jì)發(fā)展; 25,000美元 用于支付20 年每年涉及工程的Kaskad 人員的生活的支出,總計(jì)500,000美元; 180萬(wàn)美元為在許可證的第2 年應(yīng)支付的Astana城市發(fā)展費(fèi)用。 140萬(wàn)美元為其它社會(huì)計(jì)劃,要求從黃金生產(chǎn)的利潤(rùn)中支付。
(在許可證被準(zhǔn)許之后30天),Kaskad N在2006年9月支付一項(xiàng)500,000美元的唯一的簽署費(fèi)用。
生產(chǎn)過(guò)程中的商業(yè)發(fā)現(xiàn)紅利,稅款和礦區(qū)使用費(fèi),依照當(dāng)前的法律規(guī)定。礦區(qū)使用費(fèi)為百分之2。

 LICENCE LOCATION AND DETAILS
2.1      Licence Location
The Kuludjun Licence is located in the far northeast of Kazakhstan immediately to the south of the Russian border (Figure 1). The licence is centred on Longitude 49° 09' 15" and Latitude 83° 05' 45". Access is by a two hour drive on sealed roads from Ust-Kamenogorsk to Samarskoe which is approximately 110 kilometres to the southeast. Ust-Kamenogorsk is the capital of the Eastern Kazakhstan Region and has daily commercial flights from Almaty. The Kuludjun field camp is approximately 20 kilometres to the northwest of Samarskoe and is accessed by a dirt road which has been built by Kaskad N.
Infrastructure in the area immediately surrounding the Kuludjun Deposit is limited except for a high voltage power line which passes through the licence area. However, infrastructure is well developed closer to Ust-Kamenogorsk due to the presence of numerous gold, copper-lead-zinc, copper-lead-zinc-gold and rare earth deposits and mines. The Kuludjun Deposit is well placed to benefit from previous development in this historic mining area.
 
2.2     Licence Details
The Kuludjun Licence is covered by a single rectangular-shaped licence (Figure 5) bounded by the coordinates 49° 14' 13" and 83° 01' 30", 49° 14' 13" and 83° 10' 00", 49° 04' 00" and 83° 10' 00", and 49° 04' 00" and 83° 01' 30" (Appendix 2). The licence covers an area of 220 km2 and was granted by the Ministry of Energy and Mineral Resources on the 23rd of August 2006 as a six year exploration licence followed by a 14 year mining licence.
SRKES did not undertake any legal due diligence to determine if the licence is in good standing or if the required regulatory reporting has been completed. However, the following information was provided by Kaskad N:
;kad N:
WiiSCMr
Figure 1: Map of Kazakhstan showing the location of the Kuludjun Deposit.
Kuludjun Technical Review: SRKES 71 19
PAGES
SRK Exploration Services Kaskad N
Renewal of the exploration licence during the exploration period is subject to Kaskad N completing a staged scope of work. In this respect Kaskad N have committed USD 5.8 million over the six year period comprising USD 300,000 in year one, USD 500,000 in year two, USD one million in each of years three and four, and USD 1.5 million in each of years five and six. A significant percentage of the annual exploration expenditures will be spent on trenching, drilling and underground development.
Year  Trenching
(rn3)  Drilling
(m)  UGDev
(m)  Cost (USD Million)
1  5000  2000   0.3
2  5000  3000   0.5
3  5000  8000  1000  1.0
4  5000  7500  800  1.0
5   7500  1000  1.5
6   3000  700  1.5
 20,000  31,000  3500  5.8
Table 1: Summary of yearly expenditures per proposed Kaskad N scope of work for the six year period of the exploration licence. Cost of assays, personnel and ancillary costs are included in the above. UG Dev refers to underground development.
Kaskad N must submit a' Report detailing preliminary geological fhdings and resource estimation' to the State Reserves Committee at the end of the second year. Details of resource and reserve estimates must also be submitted to the State Reserves Committee at the end of the fourth and six years for approval.
Kaskad N must pay USD 5.9 million for various social programmes. Of this USD 2.2 million has been committed for social and economic development within the local area at a rate of USD 110,000 per annum; USD 25,000 must be paid annually for occupational training of Kaskad personnel involved in the project for a total expenditure of USD 500,000 over the 20 years life of the licence; USD 1.8 million is designated for Astana City development payable in the second year of the licence. USD 1.4 million is for other social programmes and is payable from the profits of gold production.
Kaskad N paid a one-off signing fee of USD 500,000 in September 2006 (30 days after the licence was granted).
A commercial discovery bonus, taxes and royalty on production will be paid dependent upon legislation at the time. The royalty on gold is presently 2 %.

武漢翻譯公司

2012.12.25

  返回>>Top
-x