Piled foundations and / or subsoil improved direct footing foundations shall be employed in areas where considerable loads are expected, such as the place for assembling the upper machine during erection and mooring the upper machine during storms based on latest survey results and complied with suitable codes and standards requirements with approve of the Owner. Refer to clause 3.2.2 and 3.3.1 mentioned above.根據(jù)最新的調(diào)查結果和適用的規(guī)范和標準要求,在得到了業(yè)主的批準之后,對于那些預計負荷較大的區(qū)域,采用樁基礎和/或者用地基土建成的直接底腳基礎,例如:在建立過程中,組裝上部機械所使用的地方、在風暴來襲的時候,錨系上部機械所需要的地方。參考上述提及的第3.2.2條和第3.3.1條。
3.1.1.23.1.1.1 Coal Storage Yard Drainage貯煤場的排水
Rain water and contaminated water from the coal stockpile area shall be drained by permeable materials recessed into the concrete surface layer (minimum thickness at less 200mm with some temperature expansion joining gaps as indicated in Bid Drawing) and perforated high intensity pipes recessed into the compacted gravel base course layer below with appropriate falls to perimeter drains under coal pile.   The drain water thus collected shall be drained into concrete gutters constructed at both sides of each pile and the water shall be conveyed by gravity from the gutters to the sedimentation basin through reinforced concrete drain pipes. Due attention shall be made to the estimated settlement in the coal storage yard when designing the gradient of the drainage system so that the system will function without problems. Measures for prevention of settlement and some layers of high intensity polyester geotextile and geogrid or HDPE geomembrane in below layer shall be taken as necessary.使用埋入混凝土表層(在最小的厚度小于200毫米的地方,有一些溫度膨脹連接間隙,如投標圖所示。)的滲漏材料排出貯煤區(qū)的雨水和污染水。將有孔的高強度管道埋入壓實的碎石基層中(在其下部留有適當?shù)穆洳睿,以圍繞煤堆以下的排水道。所收集的廢水應排入混凝土引水槽。此引水槽建設在每個樁子的兩邊。通過鋼筋混凝土排水管道,利用引力的作用,將水從引水槽輸送到沉積池中。在設計排水系統(tǒng)的坡度時,應注意貯煤場中已被評估的沉降。這樣,此系統(tǒng)在使用過程中才不會出現(xiàn)任何問題。如有必要,應采取相應的措施,防止沉降,同時,在底層,還應采用一些高強度的聚酯土工布、土工格柵或者HDPE土工膜。
3.1.1.33.1.1.2 Coal Storage Base貯煤場地基
Coal storage base shall be provided a combination of several layers. The surface layer shall be 200mm minimum thickness at least of concrete blocks with some temperature expansion joining gaps and many short steel pieces between us as indicated in Bid Drawing. The next layer shall be compacted gravel base course, that indicated with 350mm minimum thickness at least ,least, with coefficient of compressibility K ≥ 0.90. Perforated high intensity pipes shall be arranged recessively into this gravel layer and connecting with coal yard drainage system. One permeable material layer at least between two layers above-mentioned of both high intensity polyester geogrid and woven/nowoven geotextile should be carryed out by Contractor. The specialy impermeable material layer made by clay/or high density polyethylen (HDPE) geomembrane under the compacted sand layer should be proposed in his Bid . Bid. 貯煤場地基應由幾層組成。在表層,混凝土砌塊的最小厚度至少應為200毫米,在這些砌塊中,留有一些膨脹連接間隙和配有很多的短鋼件,具體如投標圖紙所示。表層的下一層是壓實的碎石基層,其最小的厚度至少應為350毫米,壓縮系數(shù)K≥ 0.90。有孔的高強度管道埋入碎石層中,與貯煤場的排水系統(tǒng)相連接。在上述提及的2層之間(兩個高強度聚酯土工格柵和編織/非編織性的土工布),XXX至少應鋪設一層可滲水材料。在XXX的投標書中,其應提議在壓實的土層之下鋪設一層由粘土/或者高密度聚乙烯(HDPE)土工膜制成的專用的不可滲透材料。
The Contractor shall construct a concrete base course and gutter at both sides of coal pile in the coal storage yard area in accordance with the Bid Drawings, or as directed by the Owner. Specifications of the concrete base course shall comply with Clause 3.4.15.3; - 4 and 3.5.15.4根據(jù)投標圖紙或者業(yè)主指示,XXX應在貯煤區(qū)的煤堆兩邊建立混凝土基層和引水槽;炷粱鶎右(guī)范應符合第3.4.15.3條和第3.5.15.條。
3.1.1.43.1.1.3 Limestone Stockpile Area石灰石料堆場
The Limestone stockpile area shall include one (1) dry storage with steel shet coved sheds from EL+3,00 to roof and roof cover with Insulation as well as including necessary auxiliary facilities, enough for 2600 tons of dry limestone reserve purpose in all conditions of the weather.在石灰石料堆場區(qū)域,應建立一個干燥的儲料庫。儲料庫采用EL+3,00鋼制的屋頂和絕緣頂蓋。同時,在石灰石料堆場區(qū)域,需要配備必要的輔助設施,使儲料庫在各種天氣條件下能夠儲放2600噸干燥的石灰石。
The Contractor shall design and construct the works of dry Limestone storage shed  and Crushing station with steel frame structure and reinforced concrete on piled foundation if necessary to accommodate this settlement or implement ground improvement works in advance of construction to ensure that settlement after construction is minimised. He will be submitted fully calculation document and construction and test process as requirement to the Owner also .also.如有必要,XXX應該在樁基礎上面設計和建造干燥的鋼框架結構和鋼筋混凝土石灰石貯料棚和破碎站,以在施工之前容納沉降或者實施地面改善工程。這樣,在施工之后,可以確保將沉降降到最低?梢砸髽I(yè)主向XXX提供全部的計算文件和施工以及測試程序。
3.1.1.53.1.1.4 Lorries and trucks weighing station : 汽車衡
The Contractor shall be fully responsible for engineering procurement in design and construct all works, materials and services as necessary fit for the proper finishing work, operation and maintenance of the power plant of Lorries and trucks weighing station at the main entrance on/in the road in both directions and all relevant foundations and the extension of the gate house for this purpose will be provided as necessary to the approval of the Owner with no additional cost in his bid. Refer general plant layout  inlayout in Bid drawings.XXX應全權負責設計中的工程采購以及負責實施所有的工作和提供材料和服務,這些是工程竣工、
3.1.2 Cooling Water Facilities冷卻水設施
(Refer to the appropriate Bid Drawings) 參考招標文件的圖紙
3.1.2.1 General總則
The design river water level for Cooling Water Facilities shall be established based on Cam river (康河)water levels given in Volume 2.根據(jù)第二卷指定的康河水位,確定冷卻水設施的設計河水水位。
The specification must include guidance for the quantity of water to be assumed for the future extension of the power plant. It would be reasonable to state that: The capacity for the supply and discharge pipeline, discharge pit shall be twice the quantity required for 2x220MW Plant.在此規(guī)范中必須詳細說明將來擴建火電廠預計消耗的水量。同時,應說明以下信息:供水和排水管道以及排水坑的容量應是2x220MW電廠所需要容量的2倍。