標(biāo)書(shū)蓄冰設(shè)備調(diào)試目的翻譯-中英對(duì)照
1. The purpose for ice storage equipment debugging
①. 通過(guò)調(diào)試,檢驗(yàn)蓄冰設(shè)備安裝和運(yùn)行工況是否符合設(shè)計(jì)要求和設(shè)計(jì)目的;
②. 保障設(shè)備能夠運(yùn)行良好,保障北京華彬國(guó)際大廈酒店工程供冷功能的實(shí)現(xiàn);
③. 培訓(xùn)業(yè)主方操作人員,使其掌握設(shè)備的使用和維護(hù);
(1)Through testing, check whether the installation and operation operating mode of the ice storage equipment is complied with the designing requirement and purpose of design;
(2).Ensure the sound operation of equipment, ensure the realization of the cooling function of Beijing Hua Bin International hotel in China;
(3)Train the operating personnel of the owner; make it understand the operation and maintenance of the equipment;
2、 蓄冰設(shè)備調(diào)試內(nèi)容
2. Content of ice storage equipment test
①. 檢測(cè)每項(xiàng)蓄冰設(shè)備與各個(gè)系統(tǒng)的運(yùn)行工況。
Check the operating modes of every ice storage device and every system
②. 配合機(jī)電總包及冷凍機(jī)組廠家等單位檢測(cè)蓄冰設(shè)備與整個(gè)系統(tǒng)的運(yùn)行有關(guān)的控制系統(tǒng)的運(yùn)作。
Support electromechanical general address contractors and refrigeration unit manufacturers etc. to check the operation of control systems concerning ice storage devices and the whole system
③. 配合機(jī)電總包及冷凍機(jī)組廠家等單位匯編所有提交的數(shù)據(jù)及操作與維修指導(dǎo)。
Support electromechanical general address contractors and refrigeration unit manufacturers etc. to compile all the submitted data and instructions of operation and maintenance
④. 匯編所有的設(shè)備安裝檢測(cè)記錄和驗(yàn)收?qǐng)?bào)告。
Compile all the installment and checking records and acceptance reports
3、 蓄冰設(shè)備調(diào)試準(zhǔn)備
3. Preparations for Ice Storage Devices Debugging
1) 配合業(yè)主調(diào)試工作安排
1) Debugging arrangement which assorts proprietors
調(diào)試前完成所有蓄冰設(shè)備安裝及驗(yàn)收工作,積極參加相應(yīng)業(yè)主、監(jiān)理及機(jī)電總包單位和廠商成立的聯(lián)合調(diào)試工作小組工作,組織工程技術(shù)人員按時(shí)參加調(diào)試準(zhǔn)備會(huì)議,按計(jì)劃和審定詳細(xì)調(diào)試步驟和操作程序,做出具體的調(diào)試安全防范措施,并由我公司進(jìn)行蓄冰設(shè)備技術(shù)和責(zé)任澄清及協(xié)調(diào)工作。
Complete all the installment of ice storage devices and acceptance work; take part in the work by the united debugging team which is set up by relevant proprietors, supervisors, electromechanical general address contractors and manufacturers actively; organize engineering technical personnel to attend the debugging conference on schedule; work out specific debugging safety alarm measures according to the planned and audited detailed debugging steps and operation program; the technologies, responsibility declaration and coordination of ice storage device should be carried out by our company.
2012.12.1