項(xiàng)目技術(shù)負(fù)責(zé)人崗職規(guī)范翻譯-中英對(duì)照
Project Technical Executive
(1) 協(xié)助項(xiàng)目經(jīng)理管理和領(lǐng)導(dǎo)技術(shù)工作;
(1) Assist the project manager to manage and lead the technical work;
(2) 組織相關(guān)部門(mén)和人員代表項(xiàng)目部參與與建設(shè)單位、監(jiān)理單位或設(shè)計(jì)單位等就施工方案、技術(shù)、設(shè)計(jì)、質(zhì)量等方面的問(wèn)題的會(huì)議、討論或磋商;
(2) Organize the sectors and personnel concerned on behalf of the Project Department to participate in the meeting, discussion and consultation in terms of construction plans, technology, design, quality and etc. together with the construction unit, supervising unit or the design unit;
(3) 主持施工組織設(shè)計(jì)和重大技術(shù)方案的編制并負(fù)責(zé)審核、把關(guān);
(3) Direct the organizational design for construction and the establishment of important technical schemes, and be responsible for the review and final check;
(4) 組織進(jìn)度計(jì)劃的編制并監(jiān)督落實(shí),負(fù)責(zé)土建與安裝等工作之間在進(jìn)度安排方面的配合和協(xié)調(diào);
(4) Organize the establishment of the construction schedule and make supervision and implementation, be responsible for the cooperation and coordination about the schedule arrangement between the civil works, installation work and etc.
(5) 參與項(xiàng)目質(zhì)量策劃并督促技術(shù)方案和施工組織設(shè)計(jì)主要內(nèi)容的落實(shí)工作;
(5) Get involved in the project quality planning, and urge the execution of technical schemes and the main contents in the organizational design for construction;
(6) 對(duì)新技術(shù)、新工藝和新材料在本工程的推廣和使用進(jìn)行指導(dǎo)并把關(guān);
(6) Direct the promotion and application of new technology, process and material in the project and make final check;
(7) 協(xié)助項(xiàng)目經(jīng)理領(lǐng)導(dǎo)和組織創(chuàng)優(yōu)工作;
(7) Assist the project manager to lead and organize the excellence creation in the project;
(8) 負(fù)責(zé)竣工圖、竣工資料、技術(shù)總結(jié)等工作的指導(dǎo)和把關(guān);
(8) Be responsible for directing the operation including as-built drawing, data about completion and technical summary and making final check;
(9) 負(fù)責(zé)組織工人和勞務(wù)隊(duì)伍的崗前培訓(xùn)工作并審查培訓(xùn)效果。
(9) Take charge of organizing the pre-employment training of workers and labor team and examining the effect after training.